1
6 marks

Source B: Warburtons

Warburtons is the largest family-owned bakery business in the United Kingdom and in 2025 it entered its 150th year. It is still owned by the Warburton family, bakes in 13 bakeries and employs just over 5 000 people.

The year to 27 September 2025 was a record one. Revenue grew 3.9% to £769.9 million and the volume of products sold grew 4.2%. Operating profit rose 30%, from £33.3 million to £43.2 million, and profit before tax rose 33% to £42 million. During the year the company recruited more than 400 new employees, although after leavers the workforce grew by only 45. It also bought a former Rathbones bakery, which it expects to have running by September 2026.

Even after that jump in profit, Warburtons keeps only a few pence of every pound it takes. Bread is sold mainly through a handful of large supermarkets, which negotiate hard on price, so the company cannot pass higher costs on. Almost all of its improvement has to come from making bread more cheaply and wasting less of it.

That is difficult, because a standard loaf has a shelf life of five days and the business is judged on getting it onto the shelf fast. Bread that is rejected at the bakery, or returned unsold by a retailer, cannot be sold at all. Over the last four years both of those figures have been rising, and its bakeries differ widely in how much bread each employee produces.

Source: Warburtons annual results for the year to 27 September 2025

Appendix F: Output and employees at four Warburtons bakeries

Table of weekly bakery output and employees: Bolton 1 288 000 loaves, 460 employees, 2 800 each; Enfield 1 050 000, 420, 2 500; Wednesbury 924 000, 420, 2 200; Burnley 783 000, 435, not provided.

All four bakeries use the same equipment and make the same products.

Source: Analyst

Analyse one way in which measuring the number of loaves each employee makes might help Warburtons reduce its unit costs.

2
6 marks

Source B: Aldermoor Precision Ltd

Aldermoor Precision Ltd machines metal components to order for aerospace and medical equipment makers. It has one workshop in Hampshire, 42 employees and a small number of large customers, each of whom sends drawings and expects parts made to within a few hundredths of a millimetre.

In the year to March 2025 it made 92 400 components, had revenue of £3 696 000 and an operating profit of £369 600. The operating margin was 10%, down from 14% three years earlier.

Nothing has gone obviously wrong. What has happened is that more components are being made twice. A part that is out of tolerance can sometimes be reworked, which uses machine time that was meant for the next job, and sometimes has to be scrapped, which loses the material as well. Both have been rising for two years, and because almost every job is made to a customer's drawing rather than held as inventory, a scrapped part usually means a late delivery too.

The managing director, Ruth Castellan, has two proposals on her desk. One is to buy a second computer-controlled machining centre, which would let the workshop take on more work. The other is to stop organising the workshop by type of machine — all the lathes together, all the mills together — and instead group machines into cells, each cell making a family of similar parts from start to finish, with the operators trained to run every machine in their cell.

The first costs nearly four times as much as the second. The second means the workshop does more with fewer people.

Source: Aldermoor Precision Ltd

Appendix E: Aldermoor Precision Ltd selected data, year to March 2025

Table of selected 2025 data: components made 92,400; employees 42; components per employee 2,200; revenue £3,696,000; average price £40; total costs £3,326,400; operating profit £369,600; margin 10%, previously 14%.

Source: Aldermoor Precision Ltd

Analyse one way in which measuring its unit cost might help Aldermoor Precision Ltd decide what to charge its customers.

3
6 marks

Source B: Nissan Sunderland

Nissan's plant in Sunderland is the largest car factory in the United Kingdom. It opened in 1986, has built more than 11 million vehicles, and for years has turned out roughly one car every two minutes. It employs about 6 000 people directly, and tens of thousands more work for the suppliers around it.

In 2025 the plant built 273 174 vehicles: 172 641 of the Qashqai family and 100 446 Jukes, plus a small number of others. It also makes the latest electric Leaf, and from 2027 it will add a battery-electric Juke, followed by a battery-electric Qashqai.

The difficulty is not whether Sunderland can build cars well. It is how many it is building. The plant was designed to make around 600 000 vehicles a year, so it is running at well under half of what it could do. Every year the factory carries the cost of a building, the machinery inside it and the people who keep it running, whether it makes 273 000 cars or 600 000.

In May 2026 Nissan announced it would bring production together onto a single line rather than running two, which would mean a smaller factory making much better use of itself. The alternative was to keep both lines and try to win enough new models to fill them.

Source: Nissan Sunderland Plant and Nissan Europe announcements, 2025 to 2026

Appendix G: Cost and quality at Sunderland

Table: annual plant fixed costs £560m; fixed cost per vehicle £2,050 in 2025 and £933 at capacity; 1.4% need reworking, 0.9% are returned under first-year warranty; 18.6 minutes’ work per vehicle; two production lines.

Source: Analyst

Analyse one way in which measuring the fixed cost carried by each vehicle would have helped Nissan decide how to use the Sunderland plant.

4
6 marks

Source B: Toyota Manufacturing UK

Toyota Manufacturing UK builds the Corolla Hatchback and Corolla Touring Sports at Burnaston in Derbyshire, and the engines that go into them at Deeside in north Wales. Together the two plants employ about 3 000 people. Burnaston began building cars in December 1992 and built its five millionth British car, a Corolla, in October 2024.

A finished car leaves the Burnaston line roughly every 90 seconds, and about 150 000 cars a year are built there. Around 85% are exported, most of them to Europe, so the plant is judged against Toyota's other factories and has to win its work rather than be handed it.

Burnaston is run on the Toyota Production System. Anyone on the line may stop it by pulling a cord if something is not right, and it does not restart until the problem is understood. Teams meet in short standing huddles at the start of each shift, and improvements suggested by the people doing the job are expected rather than hoped for.

That makes the plant unusual in how much it measures. It records the time taken at every station, the number of cars that come off the line needing no further work, the defects found for each vehicle and the cost of putting them right. None of these figures are kept quiet: they are written up on boards the whole shift can see.

The pressure now is cost. European plants with newer lines and lower wages build the same model, and Burnaston has been asked to find a further saving on every car without spending heavily on new equipment.

Source: Toyota Manufacturing UK and Toyota Motor Europe

Appendix F: What Burnaston measures

Table of Burnaston measures: 2 600 employees, £43 500 annual cost per employee, 150 000 cars a year, 14 minutes of line time lost per shift and 96% needing no further work; labour cost per car £754.

Source: Analyst

Analyse one way in which measuring the minutes of line time lost each shift might help Toyota Manufacturing UK control the cost of building a car.

5
6 marks

Source B: 2 Sisters Food Group

2 Sisters Food Group is one of Britain's largest food manufacturers. It supplies roughly a third of the poultry eaten in the country, also makes ready meals and bakery products, employs around 13 500 people across about twenty United Kingdom sites, and is privately owned as part of Boparan Holdings. In the year to 27 July 2024 turnover was £3.05 billion, up 0.5%, with a profit before tax of £35.5 million.

Poultry is one of the most heavily checked things made in Britain. Temperature is recorded continuously, every batch is inspected, and the sites are audited by their own quality teams, by the supermarket customers who buy from them, by the regulator and by independent certification bodies. Over a year that comes to more than a thousand separate audits.

Everything about the operation is measured because almost nothing about it can be put right later. A bird that is wrong cannot be reworked; it is taken out. A line that stops costs a shift's output, and a site stopped for a day costs hundreds of thousands of pounds. Sixty-eight per cent of sales go to four supermarket customers, and each of them can audit a site at five days' notice.

That leaves two numbers in tension. The sites run close to flat out and want to keep running, and the same sites have to be able to prove what happened to every bird. Stopping the line protects the second and costs the first.

The question in front of the operations board is what would improve what the sites can prove, rather than only what they produce.

Source: Boparan Holdings Limited annual results for the year ended 27 July 2024

Appendix F: What a poultry site measures

Figures cover the sites in this report, not the whole group

Table of measures and figures: 3 million birds processed weekly; 1 250 planned running hours and 40 unplanned downtime hours (3.2% of planned hours); 48 birds per employee-hour; 78% saleable; 2 400 daily temperature checks; 98.1% orders complete and on time; about 4 300 line employees.

Source: Analyst

Analyse one way in which recording 2 400 temperature checks a day might help 2 Sisters Food Group manage its operations.

6
6 marks

Source B: Marchwood Precision Ltd

Marchwood Precision Ltd machines aluminium parts for aerospace customers from a single factory near Bristol. It delivers about 170 000 parts a year to nine customers, three of whom provide 64% of revenue. Revenue in the year to March 2025 was £19.35 million and operating profit £1.24 million. It employs 118 people and runs fourteen machines on two shifts.

Aerospace work is sold on paperwork as much as on metal. Every part leaves with a certificate saying what it was made from and who machined it, and those records have to be kept for eleven years. A part that is wrong cannot be quietly used up somewhere else; it is scrapped or sent back through the shop to be reworked.

Last year 2.1% of parts were scrapped and 1.6% were reworked, which cost £412 000 and £268 000. A further £94 000 went on warranty claims. Six inspectors check every part, but they check it after machining is finished, so a mistake made in the first minute of a cut is found an hour later when nothing can be done about it.

The machines themselves are not the constraint. They could cut for 46 000 hours a year and actually cut for 34 500. Most of the gap is setting up: 62 setups a week at an average of 95 minutes each, which is about 98 hours a week when nothing is being made.

The board has agreed that quality has to improve before the next contract review, and is choosing between two ways of doing it.

Source: Marchwood Precision Ltd

Appendix E: Marchwood Precision Ltd selected data, year to March 2025

Table of Marchwood Precision Ltd selected data: 118 employees; revenue £19.35m; operating profit £1.24m; 170 000 parts delivered each year; 14 machines; 9 customers; 64% of revenue from the three largest customers; 96.4% of orders delivered on time; 1 950 defects for each million parts delivered; 34 customer complaints last year; the certificate for a part must be kept for 11 years.

Source: Marchwood Precision Ltd

Analyse one way in which measuring defects for each million parts delivered might help Marchwood Precision Ltd.

7
6 marks

Source B: Alderney Foods Ltd

Alderney Foods Ltd makes chilled ready meals for supermarkets from one factory near Peterborough. It employs 610 people, makes about 36.5 million packs a year or roughly 700 000 a week, and in the year to March 2025 had revenue of £86.5 million, cost of sales of £73.0 million and an operating profit of £3.9 million. Five customers buy from it and the two largest provide 68% of revenue.

Everything about the business is decided by six days. That is how long a finished pack lasts, so nothing can be made early and nothing unsold can be held back. The company holds under half a million pounds of inventory against £73 million of cost of sales, and 44% of its ingredients are bought on the day they are used.

Demand is not steady and not knowable. Supermarkets confirm a firm order forty-eight hours before delivery, promotions move volumes without much warning, and a hot week takes about 18% off demand for hot meals. Last year the busiest week was 826 000 packs and the quietest 612 000, against a site that can make 840 000.

The two numbers that follow from all of this are the ones the board dislikes. Three per cent of everything made is thrown away, and 140 of the people on the lines are agency workers rather than employees.

Nobody is proposing to make the shelf life longer. The question is what to do about the waste.

Source: Alderney Foods Ltd

Appendix G: What Alderney was asked for, and what it expected

Packs ordered in a week, thousands

Bar chart comparing forecast and actual weekly packs ordered in thousands for weeks 1 to 8. Forecast remains 700 000 each week; actual orders vary from 612 000 to 826 000.
Table of Alderney Foods figures: 48 hours’ notice; 62% of weeks within 5% of forecast; busiest/quietest weeks 826 000/612 000 packs; capacity 840 000 (83% typical use); hot-week demand down 18%; 140 agency and 470 permanent line workers.

Source: Analyst

Analyse one way in which comparing the packs it forecast with the packs it was actually asked for each week might help Alderney Foods Ltd.

1
9 marks

Source B: Warburtons

Warburtons is the largest family-owned bakery business in the United Kingdom and in 2025 it entered its 150th year. It is still owned by the Warburton family, bakes in 13 bakeries and employs just over 5 000 people.

The year to 27 September 2025 was a record one. Revenue grew 3.9% to £769.9 million and the volume of products sold grew 4.2%. Operating profit rose 30%, from £33.3 million to £43.2 million, and profit before tax rose 33% to £42 million. During the year the company recruited more than 400 new employees, although after leavers the workforce grew by only 45. It also bought a former Rathbones bakery, which it expects to have running by September 2026.

Even after that jump in profit, Warburtons keeps only a few pence of every pound it takes. Bread is sold mainly through a handful of large supermarkets, which negotiate hard on price, so the company cannot pass higher costs on. Almost all of its improvement has to come from making bread more cheaply and wasting less of it.

That is difficult, because a standard loaf has a shelf life of five days and the business is judged on getting it onto the shelf fast. Bread that is rejected at the bakery, or returned unsold by a retailer, cannot be sold at all. Over the last four years both of those figures have been rising, and its bakeries differ widely in how much bread each employee produces.

Source: Warburtons annual results for the year to 27 September 2025

Appendix E: Selected data for Warburtons, year to 27 September 2025

Table of Warburtons’ selected data for 2025 and 2024: revenue £769.9m versus £741.0m; operating profit £43.2m versus £33.3m; profit before tax £42.0m versus £31.5m. 2025 also shows 3.9% revenue growth, 4.2% volume growth, just over 5 000 employees, over 400 recruits, a net increase of 45 employees and 13 bakeries.

Source: Warburtons

Appendix F: Output and employees at four Warburtons bakeries

Table comparing weekly bakery output and employees: Bolton 1 288 000 loaves and 460 employees (2 800 each); Enfield 1 050 000 and 420 (2 500); Wednesbury 924 000 and 420 (2 200); Burnley 783 000 and 435 (not provided).

All four bakeries use the same equipment and make the same products.

Source: Analyst

Assess the usefulness of the data in Appendix F to Warburtons in deciding how to improve its operations.

Calculate the number of loaves each employee makes at the Burnley bakery to support your answer.

2
9 marks

Source B: Aldermoor Precision Ltd

Aldermoor Precision Ltd machines metal components to order for aerospace and medical equipment makers. It has one workshop in Hampshire, 42 employees and a small number of large customers, each of whom sends drawings and expects parts made to within a few hundredths of a millimetre.

In the year to March 2025 it made 92 400 components, had revenue of £3 696 000 and an operating profit of £369 600. The operating margin was 10%, down from 14% three years earlier.

Nothing has gone obviously wrong. What has happened is that more components are being made twice. A part that is out of tolerance can sometimes be reworked, which uses machine time that was meant for the next job, and sometimes has to be scrapped, which loses the material as well. Both have been rising for two years, and because almost every job is made to a customer's drawing rather than held as inventory, a scrapped part usually means a late delivery too.

The managing director, Ruth Castellan, has two proposals on her desk. One is to buy a second computer-controlled machining centre, which would let the workshop take on more work. The other is to stop organising the workshop by type of machine — all the lathes together, all the mills together — and instead group machines into cells, each cell making a family of similar parts from start to finish, with the operators trained to run every machine in their cell.

The first costs nearly four times as much as the second. The second means the workshop does more with fewer people.

Source: Aldermoor Precision Ltd

Appendix E: Aldermoor Precision Ltd selected data, year to March 2025

Table of Aldermoor Precision Ltd selected data: 92,400 components, 42 employees, 2,200 per employee, revenue £3,696,000, average price £40, total costs £3,326,400, profit £369,600, and margins of 10% and 14%.

Source: Aldermoor Precision Ltd

Appendix F: Components reworked and scrapped at Aldermoor Precision Ltd

Line chart of components reworked and scrapped, showing both rising from Q1 2023–24 to Q3 2024–25: reworked 3.9%, 4.6%, 5.7%, 6.8%; scrapped 0.9%, 1.2%, 1.5%, 1.9%.
Table of Aldermoor Precision Ltd measures: reworking one component costs £11.40, scrapping costs £36.00, on-time deliveries are 91%, compared with 98% three years earlier.

Source: Aldermoor Precision Ltd

Assess the impact of rework and scrap on Aldermoor Precision Ltd's profit.

Calculate Aldermoor Precision Ltd's unit cost to support your answer.

3
9 marks

Source B: Nissan Sunderland

Nissan's plant in Sunderland is the largest car factory in the United Kingdom. It opened in 1986, has built more than 11 million vehicles, and for years has turned out roughly one car every two minutes. It employs about 6 000 people directly, and tens of thousands more work for the suppliers around it.

In 2025 the plant built 273 174 vehicles: 172 641 of the Qashqai family and 100 446 Jukes, plus a small number of others. It also makes the latest electric Leaf, and from 2027 it will add a battery-electric Juke, followed by a battery-electric Qashqai.

The difficulty is not whether Sunderland can build cars well. It is how many it is building. The plant was designed to make around 600 000 vehicles a year, so it is running at well under half of what it could do. Every year the factory carries the cost of a building, the machinery inside it and the people who keep it running, whether it makes 273 000 cars or 600 000.

In May 2026 Nissan announced it would bring production together onto a single line rather than running two, which would mean a smaller factory making much better use of itself. The alternative was to keep both lines and try to win enough new models to fill them.

Source: Nissan Sunderland Plant and Nissan Europe announcements, 2025 to 2026

Appendix E: Selected data for Nissan Sunderland

Data table: 273,174 vehicles built in 2025 (172,641 Qashqais and 100,446 Jukes), about 6,000 employees, and vehicles per employee marked “?”. Capacity is about 600,000 a year; utilisation about 46%.

Source: Nissan

Appendix G: Cost and quality at Sunderland

Table of cost and quality data: annual fixed costs £560m; fixed cost per 2025 vehicle £2,050; at capacity £933; rework 1.4%; warranty returns 0.9%; 18.6 minutes’ work per vehicle; two production lines.

Source: Analyst

Assess the usefulness of the data in Appendices E and G to Nissan in judging how well the Sunderland plant is performing.

Calculate the number of vehicles built for each employee in 2025 to support your answer.

4
9 marks

Source B: Toyota Manufacturing UK

Toyota Manufacturing UK builds the Corolla Hatchback and Corolla Touring Sports at Burnaston in Derbyshire, and the engines that go into them at Deeside in north Wales. Together the two plants employ about 3 000 people. Burnaston began building cars in December 1992 and built its five millionth British car, a Corolla, in October 2024.

A finished car leaves the Burnaston line roughly every 90 seconds, and about 150 000 cars a year are built there. Around 85% are exported, most of them to Europe, so the plant is judged against Toyota's other factories and has to win its work rather than be handed it.

Burnaston is run on the Toyota Production System. Anyone on the line may stop it by pulling a cord if something is not right, and it does not restart until the problem is understood. Teams meet in short standing huddles at the start of each shift, and improvements suggested by the people doing the job are expected rather than hoped for.

That makes the plant unusual in how much it measures. It records the time taken at every station, the number of cars that come off the line needing no further work, the defects found for each vehicle and the cost of putting them right. None of these figures are kept quiet: they are written up on boards the whole shift can see.

The pressure now is cost. European plants with newer lines and lower wages build the same model, and Burnaston has been asked to find a further saving on every car without spending heavily on new equipment.

Source: Toyota Manufacturing UK and Toyota Motor Europe

Appendix F: What Burnaston measures

Table of Burnaston measures: 2 600 workers; annual employment cost £43 500; 150 000 cars built; labour cost per car not given; 14 minutes lost per shift; 96% need no rework; 9 400 suggestions, 6 580 implemented; boards show all figures.

Source: Analyst

Appendix G: Quality at Burnaston

Line chart of defects found per vehicle, falling steadily from 0.42 in 2021 to 0.26 in 2025; the vertical axis ranges from 0.00 to 0.50 and the horizontal axis shows 2021 to 2025.
Table of Burnaston measures: 150 000 cars built yearly; 4% need rework; rework costs £185 per car; annual rework cost is unknown; 8.4 warranty claims per 1 000 cars; line stopped 61 times last month.

Source: Analyst

Assess how useful the figures Burnaston collects are in judging how well the plant is performing.

5
9 marks

Source B: Hallerton Cold Stores Ltd

Hallerton Cold Stores Ltd keeps frozen food for other people. It runs one store near Hull with 18 000 pallet spaces, holds it at about minus 24 degrees Celsius every hour of every day, and moves 1 900 pallets in and out daily. It employs 110 people, had revenue of £14.2 million in the year to March 2025 against operating costs of £12.4 million, and made an operating profit of £1.8 million.

What makes the business unlike a warehouse is electricity. Keeping 18 000 pallet spaces that cold cost £4 464 000 last year, which is by a wide margin the largest thing the company spends money on, more than it spends on wages. The bill also moves with the weather: a pallet space uses about 83 kilowatt hours in July and 58 in January.

The store is nearly full. It runs at 92% of its pallet spaces on average, picks 97.8% of pallets inside the hour it promises, and has been outside its agreed temperature range three times in a year. The oldest refrigeration plant is nineteen years old.

Customers want more space than Hallerton has, so a second store is agreed in principle. Two things are not. One is where to put it: beside the existing store, where the grid connection exists and the night shift could be shared, or in the East Midlands, far closer to the three customers who provide over half the revenue. The other is what to build: the same again, or something that uses a third less electricity for every pallet space and costs several million pounds more.

Source: Hallerton Cold Stores Ltd

Appendix F: What the store is judged on

Energy used for each pallet space, kilowatt hours

Line graph of monthly energy used per pallet space, rising from 58 kilowatt hours in January to 83 in July before falling to 63 in November; values are 61 in March, 71 in May and 74 in September.
Table of Hallerton’s store measures and figures: 18,000 pallet spaces; 16,560 full on average (92%); 1,900 pallets moved daily; 97.8% picked within the promised hour; 24 hours daily; 3 temperature breaches; 820 kilowatt-hours per pallet space yearly; refrigeration plant aged 19 years.

Source: Analyst

Appendix G: A second store, and where it could go

Tables compare current and second-store measures, plus Sites A and B: capacity, staffing and costs; build £17.4m/£21.2m, power 30.2p/28.6p per kilowatt hour, distance 164/71 kilometres and customer support 61%/88%.

Source: Analyst

Assess how useful the data Hallerton Cold Stores Ltd collects about its store is in deciding how to run it.

1
15 marks

Source B: Nissan Sunderland

Nissan's plant in Sunderland is the largest car factory in the United Kingdom. It opened in 1986, has built more than 11 million vehicles, and for years has turned out roughly one car every two minutes. It employs about 6 000 people directly, and tens of thousands more work for the suppliers around it.

In 2025 the plant built 273 174 vehicles: 172 641 of the Qashqai family and 100 446 Jukes, plus a small number of others. It also makes the latest electric Leaf, and from 2027 it will add a battery-electric Juke, followed by a battery-electric Qashqai.

The difficulty is not whether Sunderland can build cars well. It is how many it is building. The plant was designed to make around 600 000 vehicles a year, so it is running at well under half of what it could do. Every year the factory carries the cost of a building, the machinery inside it and the people who keep it running, whether it makes 273 000 cars or 600 000.

In May 2026 Nissan announced it would bring production together onto a single line rather than running two, which would mean a smaller factory making much better use of itself. The alternative was to keep both lines and try to win enough new models to fill them.

Source: Nissan Sunderland Plant and Nissan Europe announcements, 2025 to 2026

Appendix F: What Sunderland built against what it could build

Bar chart of Nissan Sunderland vehicle numbers, where designed capacity (600 000) is much higher than total built (273 174); Qashqai family 172 641 and Juke 100 446. Vertical axis: vehicles, 0 to 600 000.
Table of Nissan Sunderland vehicles built in 2025: Qashqai family 172 641; Juke 100 446; others including electric Leaf 87; total 273 174; designed capacity about 600 000; unused capacity about 326 800.

Source: Nissan

Appendix G: Cost and quality at Sunderland

Table of Sunderland plant costs and quality: annual fixed costs £560m; fixed cost per vehicle £2,050 in 2025 or £933 at capacity; rework 1.4%; warranty returns 0.9%; 18.6 minutes per vehicle; two lines.

Source: Analyst

Appendix H: Two ways of using the Sunderland plant

Comparison table: Option 1 (one line) has capacity 350,000, expected vehicles 273,000, utilisation ?, 4,900 employees, £84m cost, £430m fixed costs, £1,575 per vehicle, 14 months; Option 2 values are 600,000, 330,000, 55.0%, 6,000, £210m, £560m, £1,697, 36 months.

Source: Analyst

Nissan had two ways of using the Sunderland plant:

Option 1: bring production onto one line

Option 2: keep two lines and win more models

In May 2026 it chose Option 1. Evaluate whether this was the right decision for Nissan.

Calculate the capacity utilisation under Option 1 to support your answer.

2
15 marks

Source B: 2 Sisters Food Group

2 Sisters Food Group is one of Britain's largest food manufacturers. It supplies roughly a third of the poultry eaten in the country, also makes ready meals and bakery products, employs around 13 500 people across about twenty United Kingdom sites, and is privately owned as part of Boparan Holdings. In the year to 27 July 2024 turnover was £3.05 billion, up 0.5%, with a profit before tax of £35.5 million.

Poultry is one of the most heavily checked things made in Britain. Temperature is recorded continuously, every batch is inspected, and the sites are audited by their own quality teams, by the supermarket customers who buy from them, by the regulator and by independent certification bodies. Over a year that comes to more than a thousand separate audits.

Everything about the operation is measured because almost nothing about it can be put right later. A bird that is wrong cannot be reworked; it is taken out. A line that stops costs a shift's output, and a site stopped for a day costs hundreds of thousands of pounds. Sixty-eight per cent of sales go to four supermarket customers, and each of them can audit a site at five days' notice.

That leaves two numbers in tension. The sites run close to flat out and want to keep running, and the same sites have to be able to prove what happened to every bird. Stopping the line protects the second and costs the first.

The question in front of the operations board is what would improve what the sites can prove, rather than only what they produce.

Source: Boparan Holdings Limited annual results for the year ended 27 July 2024

Appendix E: 2 Sisters Food Group, published figures

Table of published figures: turnover £3.05bn, up 0.5%; profit before tax £35.5m; about 13,500 employees and 20 UK sites. It records private ownership within Boparan Holdings, founded in 1993.

Source: Boparan Holdings Limited

Appendix G: Who checks the sites, and what they find

Table of site audits last year: own quality teams 1,240 and 94% passed with no finding; supermarket customers 86 and 71%; regulator 52 and 88%; independent certification bodies 18 and 83%.

Share passed last year with no finding:

Bar chart of the share of audits passed with no finding: own quality teams 94%, regulator 88%, independent certification bodies 83%, and supermarket customers 71%; vertical axis ranges from 0 to 100%.

Audits in total: 1 396

Table of operating measures: 99.0% of batches pass inspection first time; 0.4% of birds are rejected; customers give 5 days’ notice, the regulator gives none; stopping one site costs £310,000 a day; 68% of sales go to four largest customers.

Source: Analyst

Appendix H: Two ways of improving what the sites can prove

Comparison table of Option 1 cameras and automatic checks and Option 2 doubled inspectors: setup £6.4m/£0.4m; annual cost £0.9m/£2.3m; rejected birds 0.15%/0.28%; works unattended yes/no; audits passing 89%/80%; fully working after 14/3 months; jobs 12/140; cannot judge a borderline bird/watch every bird.

3 000 000 birds a week. 0.4% are rejected at inspection, and each rejected bird costs £3.10 to handle.

Source: Analyst

2 Sisters Food Group is considering two ways of improving what its sites can prove about quality:

Option 1: cameras and automatic checks on every line

Option 2: double the number of trained quality inspectors

Evaluate both options and recommend which one 2 Sisters Food Group should choose.

Calculate the weekly cost of the birds rejected at inspection to support your answer.

3
15 marks

Source B: Marchwood Precision Ltd

Marchwood Precision Ltd machines aluminium parts for aerospace customers from a single factory near Bristol. It delivers about 170 000 parts a year to nine customers, three of whom provide 64% of revenue. Revenue in the year to March 2025 was £19.35 million and operating profit £1.24 million. It employs 118 people and runs fourteen machines on two shifts.

Aerospace work is sold on paperwork as much as on metal. Every part leaves with a certificate saying what it was made from and who machined it, and those records have to be kept for eleven years. A part that is wrong cannot be quietly used up somewhere else; it is scrapped or sent back through the shop to be reworked.

Last year 2.1% of parts were scrapped and 1.6% were reworked, which cost £412 000 and £268 000. A further £94 000 went on warranty claims. Six inspectors check every part, but they check it after machining is finished, so a mistake made in the first minute of a cut is found an hour later when nothing can be done about it.

The machines themselves are not the constraint. They could cut for 46 000 hours a year and actually cut for 34 500. Most of the gap is setting up: 62 setups a week at an average of 95 minutes each, which is about 98 hours a week when nothing is being made.

The board has agreed that quality has to improve before the next contract review, and is choosing between two ways of doing it.

Source: Marchwood Precision Ltd

Appendix E: Marchwood Precision Ltd selected data, year to March 2025

Table of Marchwood Precision Ltd selected data: 118 employees; revenue £19.35m; operating profit £1.24m; 170 000 parts delivered each year; 14 machines; 9 customers; 64% of revenue from the three largest customers; 96.4% of orders delivered on time; 1 950 defects for each million parts delivered; 34 customer complaints last year; the certificate for a part must be kept for 11 years.

Source: Marchwood Precision Ltd

Appendix G: How the machine shop runs

Machine hours in a year

Bar chart of annual machine hours by cell: available versus actually cutting. Cell 1: 12 000 and 9 600; Cell 2: 11 000 and 8 200; Cell 3: 12 000 and 9 100; Cell 4: 11 000 and 7 600.
Two-column table of selected data: available machine hours 46 000; actual cutting 34 500; setup time 95 minutes; 62 setups weekly; 98 setup hours weekly; 21 breakdown hours weekly; two daily shifts; 71 shop employees.

Source: Analyst

Evaluate two ways in which Marchwood Precision Ltd could use the records it keeps of its machine hours to increase the time its machines spend cutting, and recommend which one it should do first.